Six Phases of Stone Work Project
Stone work projects are divided into six phases. Know what are they by reading the following:
Plan
Have you imagined what the size, design, and purpose of your final output will look like? It’s not just enough to visualize it. You need to come up with a strategic and feasible plan to make it real. You have to check your budget and your needs. You have to perform a site inspection too. Your plans will determine the cost and value of your structure. This is the hardest and most important phase of the project. If you need the help of a professional, don’t hesitate to hire one for a better result.
Site Preparation
Before the big day, you need to prepare the site. You have to clear the area and ready the place where you’ll be putting the equipment and materials. If you need to get a permit to start the project, do these. Check if there are any laws passed down in your local area regarding the type of project you’ll be organizing.
Equipment and Material Procurement
If you’re planning to start a large scale project, you might need to rent equipment from reliable construction companies for your excavation and piling. Be careful in purchasing your raw materials too. Make sure that they’ll arrive a day before the project date.
Organize Execution
How does the project will unfold? Have you considered how many people will participate? Have you considered which tasks in your plan you’ll be having some trouble with? Organize everything to avoid delays, poor output, and overpriced projects.
Quality Assurance
Before you use the stone work, run a quality assurance test to ensure that the structure is free from defects, and have met the required construction standards. This is when you need your mason the most.
Are you looking for a dependable mason in Frisco, TX? Contact WLC Construction at (469) 370-9811. We create beautiful stonework that lasts for a long time.